⚙️ Product Overview
The paper bowl machine isolates the forming parts and transmission parts, making it easy to clean and maintain. All transmission parts use a longitudinal shaft, barrel indexing cam, and gear transmission. All transmission components are lubricated by spray, which ensures the machine works stably. The machine is controlled by PLC, and the entire process is monitored by sensors. An inspection system is available as an option to remove disqualified cups. It is suitable for producing 16-32 OZ paper bowls.
🏢 Manufacturing Excellence
We are a leading manufacturer specializing in high-speed paper cup machines, paper bowl machines, and double wall sleeve machines. Our facility spans approximately 10,000 square meters and is equipped with advanced production capabilities. To ensure top-notch performance, we use components from renowned international brands. The transmission part utilizes cam and gear mechanisms, eliminating chains and incorporating a spray circulating lubrication system. Our high-speed machines achieve an impressive production rate of 120-150 units per minute.
❓ Frequently Asked Questions
What is the production range of this machine?
This machine is versatile and can produce various items including coffee cups, tea cups, ice cream cups, noodle bowls, salad bowls, and more, ranging from 4OZ to 32OZ with different molds.
What are the payment terms for an order?
A 30% advance payment is required, with the remaining balance to be paid before delivery.
How do you ensure the quality of the machine before shipping?
After the machine is finished, our professional engineers conduct thorough testing. We can also send samples to the customer for quality verification to ensure all technical requirements are met.
What is the warranty period for the equipment?
The cam transmission part comes with a 3-year warranty, and electrical components have a 1-year warranty. We also provide lifetime maintenance services.
Do you provide on-site installation and training?
Yes, we provide installation and training services. Typically, installation and operator training are completed within 3 working days per machine.
How is technical support handled after the engineer leaves?
We train your staff during the installation visit. For any subsequent issues, customers can contact us via phone or email, and our department will respond immediately with guidance or video tutorials.